    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:5229次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    主站蜘蛛池模板: 野花社区视频在线观看| 亚洲精品Aa| 久在线中文字幕亚洲日韩| 成人午夜精品无码试看120秒| 国产乱码精品一区二三 | 大色欧美| 精品国产性色无码av网站| 91视频污| 日本极品少妇xxxx| 日韩国产欧美| 欧洲一区亚洲一区香蕉| 正在播放:?37岁大奶美人妻打开双腿狂舔黑鲍鱼!| 日韩人妻无码精品| 无码?人妻?在线| 亚洲a成人片在线观看| 午夜中文在线| jizz无码在线观看| 嘉义县| 国自产拍偷拍精品啪啪模特| 激情99| 人人妻人人澡人人爽| 国产av一区二区三区丝袜| 久久国模吧| 丰满少妇a级黄片在线免费观看| 东京热大轮奸| 亚洲无码一| 国产黑丝袜在线观看视频| 在线看av一区二区三区 | 欧美成人精品一级在线观看| 国产足交| 亚洲人成色777777精品音频| 亚州性色| 草草浮力影院| 青青av| 婷婷色色国产| xxxx中国91| 啦啦啦视频在线日韩精品| 亚洲精品国产av一区二区| 日韩一区二区三区在线观院 | 在线播放深夜精品三级| 久久久精品人妻一区二区三区蜜桃|