    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:5169次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進行復核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應按圖紙的要求進行調(diào)整,調(diào)整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產(chǎn)生應力對傳動設備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機器連接前,應防止強力相對,在自由狀態(tài)下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應垂直安裝,在投入試運行時,要及時調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進行,開啟和回座壓力要符合設計文件的規(guī)定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設計文件核對其型號,并按介質(zhì)流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時,閥門不得關(guān)閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    主站蜘蛛池模板: 柳河县| 久久国模吧| 色又黄又爽18禁免费网站现观看| 野花社区www高清视频| 人妻中文在线| 99国产精品永久免费视频| 丰满人妻熟妇乱又伦精品软件 | 97亚洲熟妇自偷自拍另类图片| 激情宗合网| 日韩人妻丝袜美腿中文| 97超碰人人| 国产精品xxx大片免费观看| 熟女AV天堂| www熟女com| 中文在线无码高潮潮喷在线播放| 无码av免费毛片一区二区| 精品无码一区二区三区| 国内综合无码| 亚洲国产精品综合久久一线| 一本丁香综合久久久久不卡网站| 小鲜肉自慰网站| 亚洲男人在线| 动漫av永久无码精品每日更新| 熟女中文字幕在线| 久久久无码视频| 亚洲性一交一乱一伦视频| 日韩一区二区三区av| www.狠狠干| 亚洲中文字幕无码av在线| h无码精品3d动漫在线观看| 亚洲热线99精品视频| 国产一级黄色电影| 国产一区二区三区在线播| 国产成人精品一区二区秒拍1o| 国产一区二区三区免费在线观看| 国产在线精品一区二区中文| 日韩新无码精品毛片| 爽妇综合网| 91探花国产综合在线精品| 无码专区 人妻系列 在线| 996免费视频国产在线播放|